02 315 42 79

we work by appointment only

BE0747617206

VAT Number

Vaillant Boiler

BOILER JUNKERS CERAPUR SMART TOP 22/28 -3CE ZW/B (POWER 22 KW/)

  • Condensation Wall Boiler 21.8 KW (with instant hot water)
  • Modulating heating power: 8.1 to 21.8 Kw
  • Instant domestic hot water 15.8 liters / min (dt 25°C)
  • Heatronic 3 control panel with digital display.
  • JUNKERS brochure to download PDF doc ( 150 KB ) source site Junkers.be
  • Height / Width / Depth 840 × 400 × 370 mm
  • Built-in expansion tank 10 liters
  • The JUNKERS Cerapur Boiler …. link to the online catalog Facq

ALL INCLUSIVE OFFER - SUPPLY & INSTALLATION

  • Draining the heating system
  • The removal of the old boiler and evacuation of it.
  • The supply and installation of a JUNKERS Cerapur Smart TOP 22/28 – 3C ZWB boiler
  • Junkers mounting plate and filler fitting.
  • 60/100 mm wall-mounted suction cup for combustion GAS evacuation (length 1 m included)
  • Gas: connection to the gas pipe of the old boiler.
  • Boiler connection: hydraulic, sewer and electric.
  • Filling of the heating system and commissioning of the boiler.

For the Fixed Price of €2,500, including 6% VAT. The reduced rate of 6% VAT only applies to private homes that are at least 10 years old WARRANTY : 2 years full warranty on work (parts, labor and displacement) Boiler installation time : Only 24 hours from placing the order

Suction Cup

A wall suction cup (length 1 m) for the evacuation of combustion fumes is included in the offer. The suction cup can be installed in any space, but, in order to avoid any risk of intoxication with combustion fumes, minimum distances must be respected in relation to openings (windows and exterior doors).

CHIMNEY CASING: THE SUCTION CUP IS NOT SUITABLE?

Chimney lining C93:

Depending on the configuration of your home, if the suction cup is not suitable, the evacuation of the combustion gases will be via a flexible tube with a diameter of 80 mm, a tube inserted into the chimney of the building (diagram attached). Important to know: If you replace an old atmospheric boiler connected to a chimney, with a condensing boiler, you must surely pipe the chimney. Price of C93 tubing: 10 meters of PP tubing, including cap and other accessories, extra €800 including 6% VAT.